CASE STUDIES
USAF – F22 Raptor
The United States Air Force (USAF) sought a solution to maintain safe oil temperatures in their F22 Raptors, which were causing malfunctions.
UC Davis Medical Laboratory
The three 55-ton air cooled chillers at UC Davis Medical Center failed to maintain chilled water loop temperature above 90°F, while the fittings connecting the chilled water piping leaked, resulting in facility-wide water damage.
Data Center Cooling
The general contractor client required a quiet and effective chiller solution to address overheating and noise issues in their server room.
OEM Heat Exchanger
The semiconductor manufacturer required a more powerful and efficient heat exchanger to overcome production delays and quality issues caused by the existing heat exchanger's inability to meet manufacturing process demands.
Mediterranean Semiconductor
The semiconductor customer in Malta required a more powerful and efficient water chiller to resolve production delays and quality issues caused by the existing chiller's inability to meet manufacturing demands.
Water Cooling Engine Test Procedure
The medical device manufacturer client sought a cost-effective and efficient testing solution to address premature failure and overheating issues in their water-cooling engines.
TRUSTED BY OUR CLIENTS
Ask the Experts
Fill in the form below to ask.