Case Studies2023-06-15T12:41:53+00:00

CASE STUDIES

2205, 2023

USAF – F22 Raptor

The United States Air Force (USAF) sought a solution to maintain safe oil temperatures in their F22 Raptors, which were causing malfunctions.

2205, 2023

UC Davis Medical Laboratory

The three 55-ton air cooled chillers at UC Davis Medical Center failed to maintain chilled water loop temperature above 90°F, while the fittings connecting the chilled water piping leaked, resulting in facility-wide water damage.

2205, 2023

Data Center Cooling

The general contractor client required a quiet and effective chiller solution to address overheating and noise issues in their server room.

2205, 2023

OEM Heat Exchanger

The semiconductor manufacturer required a more powerful and efficient heat exchanger to overcome production delays and quality issues caused by the existing heat exchanger's inability to meet manufacturing process demands.

2205, 2023

Mediterranean Semiconductor

The semiconductor customer in Malta required a more powerful and efficient water chiller to resolve production delays and quality issues caused by the existing chiller's inability to meet manufacturing demands.

TRUSTED BY OUR CLIENTS

Ask the Experts

Fill in the form below to ask.

Go to Top